| Sl No |
Dt. of Publish |
Tender Title |
Opening date |
Department |
|
1958 |
18 / 3 / 10 |
Supply of 11 KV, 630 Amps VCB panel.
|
09 / 4 / 10 |
MATERIAL MANAGEMENT |
|
|
1957 |
18 / 3 / 10 |
Maintenance repair to the approach road by the side of M/s. IFFCO Conveyor Belt from CD-6 to CD-9 Plot.
|
07 / 4 / 10 |
ENGINEERING |
|
|
1956 |
17 / 3 / 10 |
Providing solar reflective coating to the roof of the Administrative Building.
(Rear Wing).
|
09 / 4 / 10 |
ENGINEERING |
|
|
1955 |
16 / 3 / 10 |
PROCUREMENT OF DRAWING RACK (PLAN FILLING CABINET) FOR A0 SIZE DRAWING.
|
26 / 3 / 10 |
MATERIAL MANAGEMENT |
|
|
1954 |
13 / 3 / 10 |
Construction of Super Structure of Rail Bridge along with connecting road.
|
09 / 4 / 10 |
ENGINEERING |
|
|
1953 |
12 / 3 / 10 |
Cleaning of drains at MCHP and New Gate No.II to Atharabanki Level Crossing during the year 2010-11.
|
05 / 4 / 10 |
ENGINEERING |
|
|
1952 |
12 / 3 / 10 |
Cleaning of drains at IOHP, Fertilizer Berth and Oil Jetty area during the year 2010-11.
|
05 / 4 / 10 |
ENGINEERING |
|
|
1951 |
12 / 3 / 10 |
INVITATION FOR PREQUALIFICATION OF DRUG MANUFACTURERS.
|
16 / 4 / 10 |
MEDICAL |
|
|
1950 |
12 / 3 / 10 |
Development of Plot- D behind TATA office near weigh bridge inside Gate NO.3.
|
07 / 4 / 10 |
ENGINEERING |
|
|
1949 |
12 / 3 / 10 |
Development of Plot-E near Kalinga Engineering Workshop inside prohibited area.
|
07 / 4 / 10 |
ENGINEERING |
|
|
1948 |
12 / 3 / 10 |
Construction of modern Auditorium of 1000 capacity at Paradip.
|
08 / 4 / 10 |
ENGINEERING |
|
|
1947 |
11 / 3 / 10 |
Laying of rising main 300mm dia. C.I pipeline leading from Nuabazar Pump house to proposed CISF complex at Paradip
|
31 / 3 / 10 |
ENGINEERING |
|
|
1946 |
09 / 3 / 10 |
Annual maintenance of gardens at Biju Udyan, Railway Colony, Golpara, Boitra at Substation square for the year 2010-11.
|
29 / 3 / 10 |
ENGINEERING |
|
|
1945 |
06 / 3 / 10 |
M/R to Residential Qrs. Type-II and GHC at Madhuban Area for the year 2009-2010.
|
26 / 3 / 10 |
ENGINEERING |
|
|
1943 |
03 / 3 / 10 |
Construction of Paradip Bhawan at Paradip,an Administrative annexe building.
|
26 / 3 / 10 |
ENGINEERING |
|
|
1942 |
02 / 3 / 10 |
Replacement of Steel Plate Girder at ATBK Railway Bridge ( Bridge No.255 UP & DN).
|
30 / 3 / 10 |
ENGINEERING |
|
|
1941 |
02 / 3 / 10 |
Supply of 11/3.3 KV, 1000 KVA dry type transformer.
|
19 / 3 / 10 |
MATERIAL MANAGEMENT |
|
|
1940 |
02 / 3 / 10 |
Demolishing the central ware house at Paradip.
|
22 / 3 / 10 |
ENGINEERING |
|
|
1939 |
27 / 2 / 10 |
Annual contract for collection of revenue from the FH Gate.
|
19 / 3 / 10 |
ENGINEERING |
|
|
1938 |
27 / 2 / 10 |
Construction of Inspection Tower for Railway Siding at Athrabanki.
|
26 / 3 / 10 |
ENGINEERING |
|
|
1937 |
27 / 2 / 10 |
Cleaning of drains and disposal of sludge /debrises/ garbages inside Harbour area for the year 2009-10.
|
26 / 3 / 10 |
ENGINEERING |
|
|
1936 |
24 / 2 / 10 |
Maintenance and Repair to the Permanent Railway lines at Paradip Port for the year 2009-10 Inside Harbour area.
|
23 / 3 / 10 |
ENGINEERING |
|
|
1931 |
18 / 2 / 10 |
WHITE COLOUR SAREE AND WHITE COLOUR CLOTH FOR BLOUSE.
[ Corrigendum 1 ]
|
23 / 3 / 10 |
MATERIAL MANAGEMENT |
|
|
1929 |
17 / 2 / 10 |
FABRICATION AND ERECTION OF WAGON
TIPPLER CONTROL ROOM & STAIR CASE AT IOHP.
[ Corrigendum 1 ]
|
30 / 3 / 10 |
ELECTRICAL AND MECHANICAL |
|
|
1927 |
16 / 2 / 10 |
SUPPLY OF 3PHASE,45KW SQUIRELL CAGE INDUCTION MOTOR.
[ Corrigendum 1 ]
|
26 / 3 / 10 |
MATERIAL MANAGEMENT |
|
|
1926 |
15 / 2 / 10 |
REMOVAL OF GARBAGE FROM VESSELS.
|
18 / 3 / 10 |
MARINE |
|
|
1925 |
11 / 2 / 10 |
Overhauling of D-399 Caterpillar Engine of PPT 4 Locomotive BHEL make.
[ Corrigendum 1 ]
|
31 / 3 / 10 |
ELECTRICAL AND MECHANICAL |
|
|
1900 |
27 / 1 / 10 |
Construction of third high level bridge over Atharabanki Creek with Approach road.
[ Corrigendum 1 ]
|
30 / 3 / 10 |
ENGINEERING |
|